Correctional Facilities
& Public Buildings
Clinton Community Center, Clinton, Missouri
The project included HVAC, plumbing, electrical lighting and power, fire protection, and
site lighting for a new 33,000 SF, two-story community center that includes a gymnasium,
toilet and locker rooms, meeting rooms, exercise areas and interstitial jogging track. The
HVAC design consisted of packaged rooftop units with heat recovery section, DX cooling,
and electric heat. The electrical design included a 600 amp, 277/480 volt service. Fire
protection was provided to meet NFPA and local authority requirements.
Fire and Medical Station, Lawrence,
Kansas
This project was an 11,650 SF building with three Apparatus Bays, twelve bedrooms, a
Kitchen/Dining/Living area, Exercise Room, as well as a Station Office and Support Spaces.
Plumbing design included all hot and cold water distribution layout as well as waste and
vent piping systems, including oil and sand separators. Hot water was sized for multiple
showers as well as laundry, kitchen and decontamination use. HVAC systems utilized
packaged rooftop units to heat and cool the spaces and provide zone control. Separate
exhaust systems were provided for the Kitchen, Toilets/Locker Rooms, Laundry,
Decontamination Room, and The Apparatus Bays. Low density infrared radiant heaters were
used to warm the Apparatus Bays during cold weather. Electrical systems included energy
efficient T-8 fluorescent lamps and compact fluorescent downlights. Fire station was tied
into a central dispatch center for alarm calls. Provisions for an emergency generator was
provided to serve critical loads.
Fire Station No. 3, Leawood,
Kansas
This project was a 14,100 SF building with three Apparatus Bays, eight Dorm
Rooms, a Kitchen/Dining area, Training Room, as well as Offices for Fire Marshall, Fire
Prevention, Police, and Support Spaces. Plumbing design included all hot and cold water
distribution layout as well as waste and vent piping systems, including oil and sand
separators. Hot water was sized for multiple showers as well as laundry, kitchen and
decontamination use. HVAC systems utilized packaged rooftop units to heat and cool the
spaces and provide zone control. Separate exhaust systems were provided for the Kitchen,
Toilets/Locker Rooms, Laundry, Decontamination Room, and the Apparatus Bays. Low density
infrared radiant heaters were used to warm the Apparatus Bays during cold weather.
Electrical Systems included energy efficient T-8 fluorescent lamps and compact fluorescent
downlights. Fire station was tied into a central dispatch center for alarm calls. An
emergency generator was provided to serve critical loads.
Fire & Medical Station No. 2, Lawrence, Kansas
This project was an 11,650 SF building with three Apparatus Bays, twelve
bedrooms, a Kitchen/Dining/Living area, Exercise Room, as well as a Station Office and
Support Spaces. Plumbing design included all hot and cold water distribution layout as
well as waste and vent piping systems, including oil and sand separators. Hot water was
sized for multiple showers as well as laundry, kitchen and decontamination use. HVAC
systems utilized packaged rooftop units to heat and cool the spaces and provide zone
control. Separate exhaust systems were provided for the Kitchen, Toilets/Locker Rooms,
Laundry, Decontamination Room, and The Apparatus Bays. Low density infrared radiant
heaters were used to warm the Apparatus Bays during cold weather. Electrical systems
included energy efficient T-8 fluorescent lamps and compact fluorescent downlights. Fire
station was tied into a central dispatch center for alarm calls. Provisions for an
emergency generator was provided to serve critical loads.
Remodeling projects as part of an Indefinite Delivery
Contract for the USPS at facilities in Topeka, Wichita, and Kansas City, Kansas
This is an indefinite quantity contract with a contract maximum amount of
$1,000,000 and an annual maximum of $250,000. This project covers US Postal facilities in
the Kansas and Missouri district. Projects to date include renovation of approximately
5,000 sq. ft. at the Wichita Bulk Mailing Facility which involved the addition of a new
roof top air handling unit along with duct work and grilles and diffusers to condition the
space. In addition, lighting was revised as well as the fire protection system. Another
project was to add an additional 3,000 amp switchboard at the Topeka Bulk Mail Facility.
Three additional projects at the Kansas City, Kansas Bulk Mail Facility involved the
remodel of 2 toilet areas to meet federal accessibility and ADA requirements, replacement
of packaged computer room air conditioning units and dry coolers with new and to remove
and replace two 900 ton cooling towers from the roof of the present facility.
Addition and Remodeling to Fire Station #25, Kansas City,
Missouri
The project involved a remodel of an existing fire station and addition. The
remodel portion included new heating, ventilation and lighting in the truck bay. The
addition included sleeping quarters, showers and kitchen facilities. Existing offices and
the new addition were provided with new air conditioning along with new lighting.
Fire Safety and HVAC Repairs,
Boonville Correctional Center, Boonville, Missouri
This project consisted of the addition of new fire alarm systems in approximately 18
buildings and tying them all together on a common backbone for reporting to a Central
Command Center located at the Main entrance gate. Addressable devices were used to
determine the origin of any alarms quicker. In addition, wet pipe fire protection systems
were added to approximately 15 buildings housing inmates for property protection. This
work included new distribution piping to the building from the campus water distribution
system along with DNR required backflow preventers.
A separate project at this facility
added new air conditioning equipment to four inmate dormitories consisting of either
packaged ground mounted units with exterior ductwork up the outside of the building to
serve the floors or by the use of split systems with the indoor unit being located in an
Equipment Room and the condensing unit placed outside on concrete pads. Separately, fan
coil units and an air cooled chiller were replaced at the Chapel and the existing steam
distribution system was modified to provide additional heat via a heat exchanger to the
fan coil units.
Police Academy/Justice Center,
Overland Park, Kansas
This project was a 12,000 SF stand alone single story building located on the campus
of Johnson County Community College in Overland Park, Kansas. The building housed training
classrooms and Administrative Offices for the Overland Park Police Department. Plumbing
design included all hot and cold water distribution, shower facilities, waste and vent
piping systems. HVAC system utilized a direct expansion split system with VAV air
distribution. Air handling unit design incorporated an air-to-air heat exchanger.
Individual space control was provided by utilizing series fan powered VAV boxes complete
with electrical reheat. Electrical systems included energy efficient T-8 fluorescent lamps
and compact fluorescent downlights. Systems design included voice/data coordination, fire
alarm system, and power distribution.
- Sedalia Fair Grounds Ticket Building, Sedalia, Missouri
- Chillicothe Post Office, Chillicothe, Missouri
- Blue Valley Post Office, Overland Park, Kansas
- East Olathe Branch Post Office, Olathe, Kansas
- Platte County Courthouse, 27,000 SF, Platte County, Missouri
- U. S. Census Center, remodel of 100,000 SF of warehouse into Offices/ Computer Room/
Processing Space, Austin, Texas
- U. S. Census Center, remodel of 100,000 SF of warehouse into Offices/ Computer Room/
Processing Space, Albany, New York
- Correctional Center, Miscellaneous improvements, Chillicothe, Missouri
- Pre-release Center, Miscellaneous improvements, Tipton, Missouri
|

    |
|