Educational Facilities
Raytown Schools Technology Center, Raytown School District
Project
included the addition of 43,000 SF of Industrial/VoTech areas, 33,000 SF of classrooms and
office areas, a new 1,600 SF server room, and 39,500SF of renovation to existing VoTech
spaces. Design included all HVAC, electrical, plumbing, fire protection and technology
design. New construction included Administration and Counciling space, Career Assessment
Center, Child Development Center, Early Childhood Professional, Cosmetology, Electronics
Technology, Automotive Technology, Welding/Metal Fabrication, Construction Trades, HVAC
Technology, and a Conference/Training Center. Renovated areas included Advertising and
Display Arts and Networking Lab. Lighting for a 310 car parking lot was included in the
design.
Broken Arrow Elementary School, Shawnee Mission School District
Project consisted of 75,000 SF new one-story elementary school building with one
classroom wing two-story. The HVAC system was water source heat pumps with cooling tower
and electric boiler. An Energy Management System was included for the HVAC system. The
fresh air units utilized electric duct heaters. Project was total electric. All rooms were
lit to I.E.S. recommended lighting levels with energy efficient light fixtures. Public
address, master clock, and fire alarm systems were included throughout the facility.
Emergency lighting was included to illuminate the path of egress per Code. Provisions were
made in all classrooms for the future installation and networking of computers throughout
the facility. Provisions were also made in all classrooms for the future installation of
cable TV system throughout the facility. This project is handicap accessible.
- Belinder Elementary, Shawnee
Mission School District
Project included installation of a new HVAC system to the existing 45,000 square foot
building and an 8,500 square foot gymnasium addition. The new HVAC system was designed to
meet the new outside air requirements recommended by ASHRAE. Rooftop units were selected
to meet this criteria. The electrical service was upgraded to meet new load requirements.
A new lighting system was provided in the corridors; a new Fire Alarm System, Public
Address System and CATV systems were provided throughout the facility. The project also
included data cabling for the addition of approximately 175 computer drops and associated
power outlets. The total cost of mechanical, electrical and plumbing work was
approximately $850,000.
- Kansas City, Missouri Public
Schools, Miscellaneous Remodeling
Project consisted of minor repair and remodel projects at six elementary schools. Work
included replacement of classroom paging system, replacement of incandescent fixtures with
fluorescent fixtures, replacement of incandescent fixtures in gymnasiums with high
intensity discharge type fixtures, replacement of water fountains with electric drinking
fountains, replacement of several panelboards and increased the size of one electric
feeder to a distribution panel. In two schools, the lighting in the Computer Lab was
changed to a more glare free type and A/C was added to the room. Total cost of mechanical,
electrical and plumbing work in the six schools was approximately $355,000.
- North Kansas City School District Admin Building, Kansas City, Missouri
- Rockhurst High School Phase IV Renovation, Kansas City, Missouri
- Three Elementary Schools, 46,000 SF each, Olathe School District, Olathe, Kansas
- Shawnee Mission Elementary School, 66,000 SF, Shawnee Mission, Kansas
- Scarborough Elementary School Addition, Olathe, Kansas
- Washington Elementary School Cafeteria Addition, Olathe, Kansas
- Platte City Middle School, Platte County R3 School District, Platte City, Missouri
- Robinson Elementary School Addition and Remodeling, Raytown, Missouri
- Additions and Remodeling to Raytown Middle School, Raytown, Missouri
|

    |
|
|